Overview
New London Metering Station is an operational substation in Ohio, United States, operated by Firelands Electric. It operates at 69 kV, serving the local grid.
New London Metering Station is a substation located in New London, Ohio, United States. Operated by Firelands Electric, this facility is part of the regional electrical infrastructure, providing voltage transformation and metering services at 69 kV. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring grid reliability and compliance with standards. As a 69 kV facility, it is typical for distribution-level substations in rural areas, supporting local power distribution. This substation plays a key role in maintaining grid stability for the surrounding community. Its operational status and connection to Firelands Electric's network contribute to reliable electricity supply in the region.
Environmental context
Located in a rural area of Ohio, the substation's environmental context is shaped by its role in local power distribution. The 69 kV voltage level indicates a distribution substation, which typically has lower environmental impact than high-voltage transmission facilities. The surrounding landscape is agricultural and residential, with minimal ecological sensitivity.
Frequently asked questions
New London Metering Station is located in New London, Ohio, United States, at coordinates 41.113693, -82.408634.
New London Metering Station operates at 69 kV, which is typical for distribution-level substations.
New London Metering Station is operated by Firelands Electric, a local utility serving Ohio.
Substations in the United States must comply with NERC reliability standards and FERC regulations, ensuring grid stability and safety.
A metering station measures and monitors electrical flow, providing data for billing and grid management. It is a critical component for accurate energy accounting.