Overview
Newark Airport Metering and Regulating Station is a 345 kV substation in Newark, New Jersey, operated by Public Service Enterprise Group. It supports the electrical infrastructure of Newark Liberty International Airport.
Newark Airport Metering and Regulating Station is a high-voltage substation located in Newark, New Jersey, United States. Operating at 345 kV, it is a critical node in the regional transmission grid, serving the electrical demands of Newark Liberty International Airport and surrounding areas. The facility is owned and operated by Public Service Enterprise Group (PSEG), a major utility in the Northeast. As a 345 kV substation, this facility operates at the transmission level, connecting bulk power from generation sources to distribution networks. It adheres to North American Electric Reliability Corporation (NERC) reliability standards and is subject to Federal Energy Regulatory Commission (FERC) oversight for interstate electricity markets. The substation likely employs modern switchgear and automation systems compliant with ISO/IEC 61850 standards for substation communication. The substation's location at a major international airport underscores its operational significance, ensuring reliable power for critical airport infrastructure including terminals, runways, and navigation systems. Its role in the PSEG network supports grid stability in the densely populated New York-New Jersey metropolitan area, contributing to energy resilience for millions of residents and businesses.
Environmental context
The substation is situated in an urban-industrial area near Newark Liberty International Airport, surrounded by transportation infrastructure and commercial zones. Its operation involves electromagnetic fields and potential oil containment from transformers, managed under environmental regulations. The facility's urban location requires careful integration with surrounding land use and noise mitigation measures.
Frequently asked questions
The substation is located in Newark, New Jersey, United States, near Newark Liberty International Airport.
The substation operates at 345 kV, which is a high-voltage transmission level used for bulk power transfer.
The substation is owned and operated by Public Service Enterprise Group (PSEG), a major utility serving New Jersey.
As part of the US transmission grid, it must comply with NERC reliability standards and FERC regulations for interstate electricity markets.
It provides reliable high-voltage power to Newark Liberty International Airport, supporting critical airport operations and infrastructure.