Risk: Medium Substation Operational

North Gate Riverside Substation: 138 kV Electrical Infrastructure in the United States

United States

Overview

North Gate Riverside is an operational substation in the United States, operating at 138 kV. It plays a role in regional grid stability and power distribution.

North Gate Riverside is an operational electrical substation located in the United States, with coordinates near 43.76°N, 87.73°W. The facility operates at a voltage of 138 kV, classifying it as a high-voltage substation critical for transmission and distribution within the regional grid. As part of the U.S. electrical infrastructure, it supports the reliable delivery of electricity to residential, commercial, and industrial consumers. The substation's 138 kV voltage level indicates it serves as a key node in the transmission network, stepping down power from higher-voltage lines or interconnecting with other substations. In the United States, such facilities are subject to NERC reliability standards and FERC regulation, ensuring operational safety and grid stability. The technology typically includes circuit breakers, transformers, and switchgear compliant with IEEE and ANSI standards. Environmentally, the substation's location in a region with variable climate conditions requires robust design to withstand weather extremes. Its role in the grid enhances community resilience by providing reliable power supply. The facility's operational status ensures continued support for local infrastructure and economic activities.

Environmental context

The substation is situated in a region with a temperate climate, where seasonal weather variations can impact grid operations. Its 138 kV voltage level and urban-proximate location (based on coordinates) necessitate careful environmental management to minimize electromagnetic field exposure and ensure compliance with local land-use regulations. The facility's design likely incorporates measures to mitigate visual impact and noise, aligning with community standards.

Frequently asked questions

North Gate Riverside substation is located in the United States, with approximate coordinates 43.757284°N, 87.733682°W.

North Gate Riverside substation operates at a voltage of 138 kV, which is a common high-voltage level for transmission and distribution in the U.S. grid.

North Gate Riverside substation is currently operational, meaning it is actively used for electrical power transmission and distribution.

As a U.S. electrical substation, North Gate Riverside operates under NERC reliability standards and FERC regulations, ensuring grid stability and safety.

A 138 kV substation serves as a critical node in the transmission network, stepping down voltage for distribution or interconnecting with other high-voltage lines to ensure reliable power delivery.
UtilityRadar
More
Press Esc to close · Browse by sector