Overview
North Keene Substation is an operational 115 kV substation in Keene, New Hampshire, owned and operated by Eversource. It plays a key role in regional grid stability.
North Keene Substation is an electrical substation located in Keene, New Hampshire, United States. Operated by Eversource, it operates at 115 kV, a standard transmission voltage level for distributing power across the region. The substation is currently operational and serves as a critical node in the local electrical infrastructure. As a 115 kV substation, North Keene is part of the high-voltage transmission network that connects generation sources to distribution systems. In the United States, such facilities are subject to NERC reliability standards and FERC regulations to ensure grid stability. Eversource, the owner and operator, is a major utility in New England, and this substation supports the region's energy needs. The substation's location in Keene, a city in southwestern New Hampshire, places it within a mixed urban and rural environment. It contributes to the resilience of the local grid, providing power to residential, commercial, and industrial customers. Its role in voltage regulation and load balancing is essential for maintaining reliable electricity supply in the area.
Environmental context
The substation is situated in Keene, New Hampshire, an area with a temperate climate and seasonal weather variations. Electrical infrastructure like this 115 kV substation must withstand winter storms and ice loads, which can affect overhead lines and equipment. The facility's design and maintenance practices are adapted to these conditions to ensure continuous operation.
Frequently asked questions
North Keene Substation is located in Keene, New Hampshire, United States, at coordinates 42.943963, -72.300098.
North Keene Substation operates at 115 kV, which is a standard high-voltage transmission level used for distributing electricity over long distances.
North Keene Substation is owned and operated by Eversource, a major utility company serving New England.
In the United States, substations like North Keene must comply with NERC reliability standards and FERC regulations to ensure grid stability and safety.
A 115 kV substation steps down transmission voltage for distribution to local networks, helping to balance load and maintain reliable power supply to homes and businesses.