Overview
Northern Wind Rock Aetna Switching Substation is an operational substation in the United States. It operates at 34.5 kV and supports regional grid stability.
Northern Wind Rock Aetna Switching Substation is a substation located in the United States, with coordinates 44.023078, -96.052657. As a switching substation, it plays a key role in managing electrical power flow and ensuring grid reliability within its region. The facility operates at a voltage of 34.5 kV, which is typical for distribution-level substations that serve local industrial or residential loads. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set standards for grid reliability and transmission operations. In the United States, substations like this one are critical for voltage regulation and fault isolation, often incorporating automation technologies such as IEC 61850 for efficient monitoring and control. This substation contributes to the stability of the local electrical grid by facilitating the switching and distribution of power. Its operational status ensures continued service to the surrounding area, supporting both residential and commercial electricity needs. The facility's location in a rural or semi-urban area underscores its importance in maintaining reliable power supply away from major urban centers.
Environmental context
The substation is situated in a region with a continental climate, characterized by cold winters and warm summers. Its location in a rural area minimizes direct environmental impact, though the facility's operation supports the integration of renewable energy sources like wind power, which is prevalent in the region. The 34.5 kV voltage level indicates a distribution role, reducing the need for long-distance transmission and associated land use.
Frequently asked questions
Northern Wind Rock Aetna Switching Substation is located in the United States at coordinates 44.023078, -96.052657.
The substation operates at a voltage of 34.5 kV, which is typical for distribution-level substations.
The substation is currently operational, meaning it is actively managing power flow and supporting grid stability.
As a US electrical infrastructure facility, it operates under NERC reliability standards and FERC regulations, ensuring grid stability and compliance.
A switching substation manages the routing of electrical power, allowing for isolation of faults and reconfiguration of the grid to maintain reliable service.