Substation Operational

Noxapater Substation - 161 kV Electrical Substation in Noxapater, Mississippi

United States

Overview

Noxapater Substation is an operational electrical substation in Noxapater, Mississippi, United States, operating at 161 kV for grid stability.

Noxapater Substation is an operational electrical substation located in Noxapater, Mississippi, United States. It operates at a voltage of 161 kV, classifying it as a high-voltage transmission substation that plays a key role in regional power distribution. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for transmission-level assets. The 161 kV voltage level is typical for sub-transmission and transmission applications, connecting local distribution networks to the broader grid. As part of the U.S. electrical infrastructure, Noxapater Substation contributes to grid reliability and power delivery in central Mississippi. Its operational status ensures continued service to the surrounding community, supporting residential, commercial, and industrial electricity needs.

Environmental context

Located in a rural area of Mississippi, the substation's environmental context includes proximity to agricultural lands and forested regions. The 161 kV voltage level indicates moderate electromagnetic field exposure, with standard mitigation measures in place. The site's rural setting reduces urban heat island effects and allows for natural vegetation buffers, supporting local wildlife habitats.

Frequently asked questions

Noxapater Substation is located in Noxapater, Mississippi, United States, at coordinates 33.003818, -89.062410.

Noxapater Substation operates at a voltage of 161 kV, which is typical for high-voltage transmission and sub-transmission applications.

Noxapater Substation is currently operational, meaning it is actively used for electrical power transmission and distribution.

As a U.S. electrical substation, Noxapater Substation must comply with NERC reliability standards and FERC regulations for transmission-level assets.

A 161 kV substation steps down high-voltage transmission power for local distribution, ensuring reliable electricity supply to residential, commercial, and industrial customers.
UtilityRadar
More
Press Esc to close · Browse by sector