Overview
Orange Park North Substation #14 CLAY is an operational electrical substation in Florida, United States, owned by Clay Electric Cooperative. It operates at 115 kV, serving the local grid.
Orange Park North Substation #14 CLAY is an electrical substation located in Orange Park, Florida, United States. Owned and operated by Clay Electric Cooperative, the facility is part of the regional transmission and distribution network. The substation operates at a voltage level of 115 kV, which is typical for sub-transmission or distribution substations serving medium-sized communities. The substation operates under the regulatory framework of the United States, which includes reliability standards set by the North American Electric Reliability Corporation (NERC) and oversight by the Federal Energy Regulatory Commission (FERC) for transmission-level assets. As a cooperative-owned facility, it is also subject to state-level regulations from the Florida Public Service Commission. The 115 kV voltage level indicates that this substation likely steps down power from higher transmission voltages for local distribution, serving residential, commercial, and industrial customers in the Orange Park area. Orange Park North Substation plays a critical role in maintaining grid stability and reliability for the surrounding community. As part of Clay Electric Cooperative's infrastructure, it supports the cooperative's mission to provide affordable and reliable electricity to its members. The substation's location in a suburban area near Jacksonville underscores its importance in meeting the energy demands of a growing population. Its operational status ensures continued service to the local grid, contributing to the overall resilience of the regional electrical infrastructure.
Environmental context
The substation is located in Orange Park, a suburban area in Clay County, Florida, characterized by a mix of residential developments and commercial zones. The region's flat terrain and humid subtropical climate pose challenges for electrical infrastructure, including potential impacts from severe weather such as hurricanes and thunderstorms. The substation's design and maintenance likely incorporate measures to withstand these conditions, such as elevated equipment and robust grounding systems. The surrounding environment includes wetlands and waterways, which require careful management of stormwater runoff and vegetation to prevent interference with substation operations.
Frequently asked questions
Orange Park North Substation #14 CLAY is located in Orange Park, Florida, United States, at coordinates 30.182793, -81.730169.
The substation operates at a voltage of 115 kV, which is typical for sub-transmission or distribution substations.
The substation is owned and operated by Clay Electric Cooperative, a member-owned electric utility serving parts of Florida.
As part of the U.S. electrical grid, the substation must comply with NERC reliability standards and FERC regulations for transmission-level assets, as well as state-level regulations from the Florida Public Service Commission.
A 115 kV substation typically steps down higher transmission voltages (e.g., 230 kV or 500 kV) for local distribution, serving residential, commercial, and industrial customers within a community.