Substation Operational

Orange Park North Switch #1 CLAY Substation - Clay Electric Cooperative, Florida

United States

Overview

Orange Park North Switch #1 CLAY is an operational substation in Florida, United States, operated by Clay Electric Cooperative at 115 kV voltage level.

Orange Park North Switch #1 CLAY is a substation located in Orange Park, Florida, United States. It operates at a voltage of 115 kV, which is typical for sub-transmission and distribution-level electrical infrastructure. The facility is owned and operated by Clay Electric Cooperative, a member-owned utility serving residential, commercial, and industrial customers in north-central Florida. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC) for reliability standards. As a cooperative-owned asset, it is subject to state-level oversight by the Florida Public Service Commission. The 115 kV voltage level places it in the medium-voltage range, often serving as a distribution substation stepping down power from higher transmission voltages. This substation plays a key role in the local grid by providing reliable electricity to the Orange Park area. Its location in a suburban community near Jacksonville supports residential and commercial demand. The facility's operational status ensures continued service to Clay Electric Cooperative members, contributing to regional energy reliability.

Environmental context

The substation is situated in a suburban area of Clay County, Florida, near the St. Johns River. The region experiences a humid subtropical climate with frequent thunderstorms and hurricane risks, which can impact electrical infrastructure. The facility's design likely includes measures to withstand extreme weather, such as reinforced structures and flood mitigation. Its location in a developed area minimizes direct environmental impact on natural habitats.

Frequently asked questions

Orange Park North Switch #1 CLAY is located in Orange Park, Clay County, Florida, United States, near the St. Johns River.

The substation operates at 115 kV, which is a common voltage for sub-transmission and distribution networks in the United States.

The substation is owned and operated by Clay Electric Cooperative, a member-owned electric utility serving north-central Florida.

As part of the US electrical grid, the substation must comply with NERC reliability standards and FERC regulations for transmission-level assets, as well as state-level oversight by the Florida Public Service Commission.

A 115 kV substation typically steps down voltage from higher transmission lines (e.g., 230 kV or 500 kV) to distribution levels (e.g., 12.47 kV) for local delivery to homes and businesses.