Overview
Oremet Substation is an operational electrical substation in Oregon, United States, owned and operated by PacifiCorp. It operates at 115 kV, serving as a key node in the regional transmission grid.
Oremet Substation is an operational electrical substation located in Oregon, United States. Owned and operated by PacifiCorp, the facility is part of the regional high-voltage transmission network, stepping down power for distribution to local communities and industrial users. The substation operates at a voltage of 115 kV, a standard level for sub-transmission and distribution systems in the United States. As a PacifiCorp asset, it falls under the regulatory oversight of the Federal Energy Regulatory Commission (FERC) for wholesale electricity markets and must comply with North American Electric Reliability Corporation (NERC) reliability standards to ensure grid stability. This facility plays a critical role in maintaining reliable electricity supply in the region. Its location in Oregon places it within the Western Interconnection, where it supports load balancing and voltage regulation. The substation's operational status contributes to the resilience of the local grid, serving residential, commercial, and industrial customers in the area.
Environmental context
The substation is situated in Oregon, a state with diverse geography including coastal ranges, valleys, and high desert. The region's electrical infrastructure must accommodate seasonal variations in demand and renewable energy integration from hydroelectric, wind, and solar sources. The 115 kV voltage level indicates a role in distributing power from transmission lines to local distribution networks, with potential environmental considerations related to electromagnetic fields and land use.
Frequently asked questions
Oremet Substation is located in Oregon, United States, at coordinates approximately 44.61° N, -123.10° W.
Oremet Substation operates at a voltage of 115 kV, which is typical for sub-transmission and distribution substations in the United States.
Oremet Substation is owned and operated by PacifiCorp, a major electric utility serving customers in the western United States.
As part of the U.S. bulk power system, Oremet Substation must comply with NERC reliability standards and is subject to FERC regulation for wholesale electricity markets.
A 115 kV substation typically steps down high-voltage transmission power for distribution to local networks, serving residential, commercial, and industrial customers while ensuring grid stability.