Overview
Ostrander Substation is a high-voltage electrical substation operated by the Bonneville Power Administration in the United States, handling 500 kV and 230 kV transmission lines.
Ostrander Substation is a key electrical infrastructure facility located in the United States, operated by the Bonneville Power Administration (BPA). It serves as a major node in the Pacific Northwest's high-voltage transmission grid, connecting 500 kV and 230 kV lines to ensure reliable power distribution across the region. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. As part of BPA's network, it adheres to stringent operational protocols to maintain grid stability and security. Ostrander Substation plays a critical role in integrating renewable energy sources, such as hydropower from the Columbia River system, into the regional grid. Its strategic location supports the transmission of electricity to urban and rural communities, contributing to the economic vitality of the Pacific Northwest.
Environmental context
Located in a region with significant hydropower generation, Ostrander Substation facilitates the transmission of low-carbon electricity. The surrounding area features mixed forest and agricultural land, and the substation's operation is subject to environmental regulations that minimize impacts on local ecosystems. Its high-voltage infrastructure is designed to reduce transmission losses, supporting energy efficiency.
Frequently asked questions
Ostrander Substation is located in the United States, with coordinates approximately 45.360950 N, -122.407403 W, in the Pacific Northwest region.
Ostrander Substation handles transmission voltages of 500 kV and 230 kV, making it a key node in the high-voltage grid.
Ostrander Substation is operated by the Bonneville Power Administration (BPA), a federal agency responsible for power transmission in the Pacific Northwest.
Ostrander Substation operates under NERC reliability standards and FERC regulations, ensuring grid stability and compliance with federal requirements.
Ostrander Substation integrates hydropower and other renewable sources into the grid, supporting reliable electricity delivery across the Pacific Northwest.