Overview
Panda Temple 2 Substation is an operational electrical substation in Texas, United States, owned by Panda Power. It operates at 345 kV, serving as a critical node in the regional transmission grid.
Panda Temple 2 Substation is an operational electrical substation located in Texas, United States, owned and operated by Panda Power. The facility operates at a voltage of 345 kV, classifying it as a high-voltage transmission substation that plays a key role in the stability and reliability of the local power grid. The substation is part of the broader U.S. electrical infrastructure, which is regulated by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These entities enforce reliability standards and oversee interstate electricity transmission. The 345 kV voltage level is typical for bulk power transmission, connecting generation sources to load centers and ensuring efficient long-distance power transfer. As a transmission substation, Panda Temple 2 facilitates the step-down of high-voltage electricity for distribution to industrial, commercial, and residential customers in the region. Its strategic location in Texas, a state with a large and growing energy demand, underscores its importance in maintaining grid stability and supporting economic activity. The facility's operational status ensures continued service to the surrounding community.
Environmental context
The substation is located in central Texas, a region characterized by a mix of urban development and agricultural land. The area's climate includes hot summers and mild winters, which can influence electricity demand patterns, particularly for air conditioning. The facility's high-voltage equipment is designed to withstand local weather conditions, including occasional severe storms. Its location away from densely populated areas reduces potential electromagnetic field exposure, while standard mitigation measures are in place to minimize any ecological impact on nearby habitats.
Frequently asked questions
Panda Temple 2 Substation is located in Texas, United States, near coordinates 31.0575 N, -97.3166 W.
Panda Temple 2 Substation operates at 345 kV, which is a standard high-voltage level for bulk power transmission in the United States.
Panda Temple 2 Substation is owned by Panda Power, a power generation and infrastructure company.
Substations in the United States must comply with NERC reliability standards and FERC regulations, which ensure grid stability and safe operation.
A 345 kV substation serves as a key node in the transmission network, stepping down high-voltage electricity from generation sources for distribution to local grids and end users.