Overview
Pic Substation is an operational electrical substation in the United States, operating at 138 kV. It plays a role in regional grid stability and power distribution.
Pic Substation is an operational electrical substation located in the United States, with coordinates 36.352750, -99.094913. The facility operates at a voltage of 138 kV, placing it in the medium-to-high voltage range typical for sub-transmission and distribution substations. As part of the U.S. electrical infrastructure, it supports the reliable delivery of electricity to local communities and industries. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for the bulk power system. The 138 kV voltage level is common for sub-transmission networks that connect high-voltage transmission lines to lower-voltage distribution systems. Such substations often include switchgear, transformers, and protection systems compliant with standards like IEEE C37 for circuit breakers. Pic Substation contributes to the resilience of the regional grid by stepping down voltage for local distribution or interconnecting generation sources. Its location in a rural area of the United States suggests it may serve agricultural or small industrial loads. The facility's operational status ensures continued support for electricity supply in the surrounding region, aligning with grid reliability goals.
Environmental context
The substation is located in a rural area of the United States, where the local environment is characterized by open plains and agricultural land. Electrical infrastructure in such settings typically has a low direct environmental footprint, though it may require vegetation management to maintain clearance around conductors. The 138 kV voltage level is associated with moderate electromagnetic fields, which are regulated by state and federal guidelines to ensure public safety.
Frequently asked questions
Pic Substation is located in the United States at coordinates 36.352750, -99.094913.
Pic Substation operates at 138 kV, a common voltage for sub-transmission and distribution substations.
Pic Substation is currently operational.
US substations are subject to NERC reliability standards and FERC regulations for grid stability and safety.
A 138 kV substation typically steps down voltage from transmission lines to distribution levels, serving local loads and interconnecting generation.