Risk: Low Substation Operational

Pineshed Substation - South Hadley, Massachusetts Electrical Infrastructure

United States

Overview

Pineshed Substation is an operational electrical substation in South Hadley, Massachusetts, owned by South Hadley Electric Light Department. It operates at 115 kV, serving the local grid.

Pineshed Substation is an operational electrical substation located in South Hadley, Massachusetts, United States. Owned and operated by the South Hadley Electric Light Department, it plays a key role in the local electrical infrastructure. The substation operates at a voltage of 115 kV, classifying it as a medium-voltage facility typical of distribution-level substations in the region. As part of the U.S. electrical grid, Pineshed Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These standards ensure reliability and security of the bulk power system. The substation's equipment likely includes circuit breakers, transformers, and switchgear compliant with IEEE and ANSI standards. The substation supports the South Hadley community by stepping down transmission voltages for local distribution. Its location in a suburban area of Massachusetts underscores its role in providing reliable electricity to residential and commercial customers. The facility contributes to grid stability and resilience in the region.

Environmental context

Located in a suburban area of Massachusetts, Pineshed Substation operates in a region with temperate climate and moderate environmental considerations. The substation's 115 kV voltage level indicates it is part of the distribution network, which typically has lower environmental impact than high-voltage transmission lines. Modern substations often incorporate SF6-free switchgear and oil containment systems to mitigate environmental risks.

Frequently asked questions

Pineshed Substation is located in South Hadley, Massachusetts, United States, at coordinates 42.247185, -72.590105.

Pineshed Substation operates at a voltage of 115 kV, which is typical for distribution-level substations in the United States.

Pineshed Substation is owned and operated by the South Hadley Electric Light Department, a municipal utility serving the South Hadley area.

As part of the U.S. electrical grid, Pineshed Substation must comply with NERC reliability standards and FERC regulations, ensuring safe and reliable operation.

A 115 kV substation typically steps down transmission voltages for local distribution, serving residential, commercial, and industrial customers within a community.