Risk: Medium Substation Operational

Plover Substation - 115 kV Electrical Infrastructure in Wisconsin, United States

United States

Overview

Plover is an operational electrical substation in the United States, handling 115 kV voltage. It plays a key role in regional grid stability and power distribution.

Plover is an operational electrical substation located in the United States, with coordinates 44.446679, -89.597944. The facility operates at a voltage level of 115 kV, classifying it as a medium-voltage substation typical of regional distribution networks. As part of the U.S. electrical infrastructure, it supports the reliable transmission and distribution of electricity to local communities and industries. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for grid stability. The 115 kV voltage level is common for subtransmission systems that connect bulk power sources to distribution networks. The facility's location in central Wisconsin places it within a region with a mix of urban and rural load centers, requiring robust infrastructure to manage seasonal demand variations. Environmentally, the substation's operation is critical for integrating renewable energy sources, such as wind and solar, into the grid. Its location in a region with significant agricultural activity means it supports both residential and industrial loads. Typical substations of this voltage class undergo regular maintenance to ensure safety and reliability. The substation's role in the local grid underscores its importance for community resilience and economic activity.

Environmental context

The substation is situated in a region with a mix of agricultural and residential land use, typical of central Wisconsin. Its operation supports the integration of renewable energy sources, such as wind and solar, which are increasingly prevalent in the area. The facility's voltage level and location contribute to grid stability and help manage load fluctuations from seasonal weather patterns. No specific environmental sensitivities are identified, but the substation's infrastructure is designed to minimize electromagnetic field impacts and comply with local environmental regulations.

Frequently asked questions

Plover substation is located in the United States, with approximate coordinates 44.446679, -89.597944, in central Wisconsin.

Plover substation operates at a voltage of 115 kV, which is typical for subtransmission and distribution networks in the United States.

Plover substation is currently operational, actively contributing to the regional electrical grid.

Substations in the United States are regulated by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards and grid stability requirements.

A 115 kV substation typically serves as a subtransmission facility, stepping down voltage from higher transmission levels to distribution levels, and helps balance load and integrate distributed generation sources.
UtilityRadar
More
Press Esc to close · Browse by sector