Risk: Medium Substation Operational

Plymouth Sub Substation: 138 kV Electrical Infrastructure in Indiana, USA

United States

Overview

Plymouth Sub is a 138 kV substation operated by NIPSCO in Indiana, United States. It plays a key role in regional grid stability and power distribution.

Plymouth Sub is an electrical substation located in Indiana, United States, operated by NIPSCO (Northern Indiana Public Service Company). The facility operates at a voltage of 138 kV, classifying it as a high-voltage substation critical for transmitting electricity from generation sources to local distribution networks. As part of NIPSCO's infrastructure, it supports the regional grid serving residential, commercial, and industrial customers in northern Indiana. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. NIPSCO, as a regulated utility, adheres to these standards to ensure grid stability and safety. The 138 kV voltage level is typical for sub-transmission substations that step down power from higher transmission voltages for local distribution. Plymouth Sub contributes to the operational resilience of the local electrical infrastructure by facilitating voltage regulation and load balancing. Its location in a rural area of Indiana supports agricultural and small urban communities, ensuring reliable power supply for daily activities and economic operations. The substation's age and specific equipment details are not disclosed, but its operational status indicates ongoing maintenance and compliance with industry standards.

Environmental context

The substation is situated in a rural area of Indiana, where the surrounding environment includes agricultural land and small communities. Electrical infrastructure like Plymouth Sub can have localized environmental impacts, such as electromagnetic fields and land use for transmission corridors. However, modern substations are designed with mitigation measures to minimize ecological disruption. The facility's operation is subject to environmental regulations that address noise, wildlife protection, and stormwater management.

Frequently asked questions

Plymouth Sub is located in Indiana, United States, at coordinates 41.337289, -86.314909. It is operated by NIPSCO.

Plymouth Sub operates at a voltage of 138 kV, which is a common sub-transmission voltage level for distributing power from high-voltage transmission lines to local distribution networks.

Plymouth Sub is operated by NIPSCO (Northern Indiana Public Service Company), a regulated utility serving customers in northern Indiana.

As part of the U.S. bulk power system, Plymouth Sub must comply with NERC reliability standards and FERC regulations. These standards cover grid stability, cybersecurity, and equipment maintenance.

A 138 kV substation steps down high-voltage electricity from transmission lines to lower voltages for local distribution. It also provides voltage regulation, switching, and protection for the grid.
UtilityRadar
More
Press Esc to close · Browse by sector