Risk: Low Substation Operational

Prince Substation - Operational 115 kV Electrical Substation in the United States

United States

Overview

Prince Substation is an operational electrical substation in the United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.

Prince Substation is an operational electrical substation located in the United States, with coordinates 33.452080, -104.527368. The facility operates at a voltage level of 115 kV, classifying it as a medium-voltage substation typical for regional power distribution and transmission support. The substation operates under the regulatory framework of the United States, which includes NERC reliability standards and FERC oversight for transmission-level assets. Substations like Prince are critical nodes in the grid, facilitating voltage transformation and power routing. The 115 kV voltage level is commonly used for sub-transmission and distribution, serving industrial, commercial, and residential loads. As part of the electrical infrastructure, Prince Substation contributes to grid reliability and energy delivery in its region. Its operational status ensures continued support for local power distribution. The facility's location in a rural area of the United States underscores its role in connecting remote generation sources to the broader grid.

Environmental context

The substation is located in a rural area of the United States, where electrical infrastructure supports agricultural and residential energy needs. The 115 kV voltage level indicates moderate environmental footprint, with typical considerations for electromagnetic fields and land use. Substations in such settings often integrate with local ecosystems through careful siting and vegetation management.

Frequently asked questions

Prince Substation is located in the United States at coordinates 33.452080, -104.527368, in a rural area.

Prince Substation operates at a voltage of 115 kV, which is typical for sub-transmission and distribution networks.

Prince Substation is currently operational, actively supporting the regional electrical grid.

Substations in the United States are subject to NERC reliability standards and FERC regulations for transmission-level assets, ensuring grid stability and safety.

A 115 kV substation typically serves as a sub-transmission or distribution node, stepping down voltage for local distribution or interconnecting generation sources to the grid.
UtilityRadar
More
Press Esc to close · Browse by sector