Overview
Red Maple Substation is an operational electrical substation in the United States, operating at 138 kV. It plays a role in the regional power grid, supporting electricity transmission and distribution.
Red Maple Substation is an operational electrical substation located in the United States, with coordinates 44.416977, -88.099774. The facility operates at a voltage of 138 kV, placing it within the high-voltage transmission category, which is typical for substations that interconnect major power lines and ensure grid stability. The substation operates under the regulatory framework of the United States, which includes NERC reliability standards and FERC oversight for transmission-level assets. At 138 kV, this substation is a key node in the regional grid, facilitating the efficient transfer of electricity from generation sources to distribution networks. Such substations are critical for maintaining voltage levels and system reliability. As part of the electrical infrastructure, Red Maple Substation contributes to the reliable supply of electricity to surrounding communities and industries. Its operational status ensures continued support for grid stability and energy delivery. The facility's location and voltage level underscore its importance in the broader electrical network.
Environmental context
The substation is situated in a region with a temperate climate, which influences the design and maintenance of electrical equipment. The 138 kV voltage level indicates a significant role in the transmission grid, requiring careful management of electromagnetic fields and vegetation clearance to prevent outages. The facility's location, likely in a rural or suburban area, minimizes direct environmental impact while supporting the energy needs of the region.
Frequently asked questions
Red Maple Substation is located in the United States at coordinates 44.416977, -88.099774.
Red Maple Substation operates at a voltage of 138 kV, which is typical for high-voltage transmission substations.
Red Maple Substation is currently operational, meaning it is actively contributing to the electrical grid.
In the United States, substations like Red Maple must comply with NERC reliability standards and FERC regulations for transmission-level assets.
A 138 kV substation helps maintain voltage levels and facilitates the efficient transmission of electricity, supporting overall grid reliability and stability.