Overview
Reed Creek Substation is an operational electrical substation in the United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.
Reed Creek Substation is an operational electrical substation located in the United States, with coordinates 34.450941, -82.923486. The facility operates at a voltage of 115 kV, which is typical for sub-transmission and distribution-level infrastructure, serving to step down power for local distribution or interconnect regional grids. As a substation in the United States, Reed Creek Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) oversight for transmission-level assets. The 115 kV voltage class is commonly used for sub-transmission networks, connecting bulk power systems to distribution networks, and is critical for maintaining grid stability in its service area. The substation's operational status indicates it is actively contributing to the electrical infrastructure of the region. Its location in the southeastern United States places it within a grid that supports a mix of industrial, commercial, and residential loads. The facility's role in voltage regulation and power flow management is essential for reliable electricity supply to surrounding communities.
Environmental context
The substation is located in a region with a humid subtropical climate, which can affect equipment performance and maintenance schedules. The 115 kV voltage level suggests it serves a mixed urban-rural area, where grid reliability is important for both residential and agricultural consumers. The facility's design likely includes measures to withstand local weather events such as thunderstorms and occasional hurricanes, which are common in the southeastern United States.
Frequently asked questions
Reed Creek Substation is located in the United States at coordinates 34.450941, -82.923486.
Reed Creek Substation operates at a voltage of 115 kV, which is typical for sub-transmission and distribution-level substations.
Reed Creek Substation is currently operational, meaning it is actively functioning as part of the electrical grid.
Substations in the United States must comply with NERC reliability standards and FERC regulations, which ensure grid stability and security.
A 115 kV substation typically steps down transmission-level voltage for distribution to local networks, playing a key role in power delivery and grid reliability.