Overview
Rienzi is a 138 kV electrical substation located in the United States. It plays a role in regional grid stability and power distribution.
Rienzi is an operational electrical substation located in the United States, with coordinates 43.763192, -88.417133. The facility operates at a voltage level of 138 kV, which is typical for sub-transmission and distribution networks, serving to step down power from higher voltage transmission lines for local distribution. Operating within the United States, Rienzi is subject to NERC reliability standards and FERC regulation for grid stability. The 138 kV voltage class is common for supplying industrial and urban areas, and the substation likely includes switchgear and transformers to manage power flow. Its location in the Midwest suggests it supports a mix of agricultural and residential loads. The substation's operational status indicates it is actively contributing to the electrical infrastructure of the region. As part of the interconnected grid, it helps maintain voltage stability and reliability for end-users. The facility's role is critical for local power distribution, ensuring consistent electricity supply to surrounding communities.
Environmental context
The substation is located in a rural area of Wisconsin, near the city of Fond du Lac. The surrounding landscape is primarily agricultural, with farmland and small communities. The 138 kV voltage level suggests it serves as a distribution hub, with potential environmental considerations including electromagnetic fields and land use for transmission corridors. The facility's operation aligns with regional grid reliability requirements.
Frequently asked questions
Rienzi substation is located in the United States at coordinates 43.763192, -88.417133, near Fond du Lac, Wisconsin.
Rienzi substation operates at 138 kV, a common voltage for sub-transmission and distribution networks.
Rienzi substation is operational, actively contributing to the regional electrical grid.
Substations in the United States must comply with NERC reliability standards and FERC regulations to ensure grid stability and safety.
A 138 kV substation typically steps down transmission voltage for local distribution, serving industrial, commercial, and residential areas.