Risk: Medium Substation Operational

Rivery Substation: 138 kV / 25 kV Electrical Substation in Texas, United States

United States

Overview

Rivery Substation is an operational electrical substation in Texas, United States, owned by the Lower Colorado River Authority. It operates at 138 kV and 25 kV voltage levels.

Rivery Substation is an operational electrical substation located in Texas, United States. Owned by the Lower Colorado River Authority, it serves as a key node in the regional power grid, stepping down transmission-level voltage for local distribution. The substation operates at dual voltage levels of 138 kV and 25 kV, indicating its role in both high-voltage transmission and medium-voltage distribution. As part of the US electrical infrastructure, it falls under NERC reliability standards and FERC regulation, ensuring grid stability and compliance with mandatory reliability requirements. Located in Texas, a state with a growing population and industrial base, Rivery Substation supports the electrical needs of the surrounding community. Its operation by the Lower Colorado River Authority, a public utility, underscores its importance in delivering reliable power to residential, commercial, and industrial customers in the region.

Environmental context

The substation is situated in a region characterized by a mix of urban and suburban development, with proximity to the Colorado River. Electrical infrastructure in this area must consider flood risks and heat-related impacts on equipment. The dual-voltage design allows for efficient power distribution while minimizing land use, supporting local energy needs without significant environmental disruption.

Frequently asked questions

Rivery Substation is located in Texas, United States, with coordinates approximately 30.6485° N, -97.6896° W.

Rivery Substation is owned by the Lower Colorado River Authority, a public utility serving central Texas.

Rivery Substation operates at 138 kV for transmission and 25 kV for distribution, facilitating the step-down of high-voltage power for local use.

As part of the US electrical grid, Rivery Substation must comply with NERC reliability standards and FERC regulations, ensuring grid stability and operational safety.

Substations like Rivery are critical for voltage transformation, switching, and protection, enabling efficient transmission and distribution of electricity from generation sources to end users.
UtilityRadar
More
Press Esc to close · Browse by sector