Risk: Medium Substation Operational

Roane Substation - 500 kV TVA Electrical Substation in Tennessee

United States

Overview

Roane Substation is a 500 kV electrical substation operated by the Tennessee Valley Authority in Tennessee, United States. It plays a critical role in regional grid stability and power transmission.

Roane Substation is a high-voltage electrical substation located in Tennessee, United States, and operated by the Tennessee Valley Authority (TVA). With a voltage level of 500 kV, it is classified as a large-scale transmission substation, essential for long-distance power transfer and grid interconnection. The facility is part of TVA's extensive network serving the Tennessee Valley region. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) oversight for transmission-level assets. As a 500 kV facility, it adheres to stringent requirements for system planning, protection, and maintenance to ensure grid stability. The equipment likely includes modern switchgear and automation systems compliant with industry standards. Roane Substation's environmental significance lies in its role in supporting the regional power grid, enabling efficient electricity distribution to residential, commercial, and industrial customers. Its location in Tennessee contributes to the reliability of the Southeastern US power system, facilitating integration of diverse generation sources and load centers.

Environmental context

The substation is situated in a region with varied topography and climate, which influences grid design and maintenance. High-voltage equipment like that at Roane Substation requires careful environmental management to minimize impacts on local ecosystems, including electromagnetic field considerations and stormwater runoff controls. The facility's rural setting reduces direct exposure to urban heat island effects but necessitates robust vegetation management to prevent outages.

Frequently asked questions

Roane Substation is located in Tennessee, United States, at coordinates 35.945055, -84.388536. It is operated by the Tennessee Valley Authority.

Roane Substation operates at 500 kV, making it a high-voltage transmission substation critical for long-distance power transfer and grid interconnection.

Roane Substation is operated by the Tennessee Valley Authority (TVA), a federally owned electric utility company serving the Tennessee Valley region.

As a transmission-level asset in the US, Roane Substation must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.

A 500 kV substation like Roane is a key node in the bulk power system, stepping up or down voltage for efficient transmission over long distances and interconnecting different parts of the grid.
UtilityRadar
More
Press Esc to close · Browse by sector