Overview
Saguache Substation is an operational electrical substation in Saguache, Colorado, United States. It operates at 115 kV, serving as a key node in the regional power grid.
Saguache Substation is an operational electrical substation located in Saguache, Colorado, United States. The facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation that plays a role in local power distribution and transmission. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. In Colorado, the facility is likely subject to state-level oversight by the Colorado Public Utilities Commission. The 115 kV voltage level is typical for subtransmission systems that connect distribution networks to higher-voltage transmission lines. As part of the electrical infrastructure in the San Luis Valley region, Saguache Substation supports grid stability and power delivery to surrounding communities. Its operational status ensures continued service for local residential, agricultural, and commercial customers. The facility's location in a rural area underscores its importance in maintaining reliable electricity supply in less densely populated regions.
Environmental context
The substation is situated in the San Luis Valley, a high-altitude basin in southern Colorado. The area's semi-arid climate and agricultural economy rely on stable electricity for irrigation and processing. The facility's 115 kV voltage level indicates moderate environmental footprint, with typical considerations including electromagnetic field management and vegetation clearance for safety and reliability.
Frequently asked questions
Saguache Substation is located in Saguache, Colorado, United States, at coordinates 38.088020, -106.129976.
Saguache Substation operates at a voltage of 115 kV, which is typical for subtransmission-level substations.
The substation is regulated under NERC reliability standards and FERC oversight for the bulk power system, with state-level regulation by the Colorado Public Utilities Commission.
A 115 kV substation typically steps down voltage from higher transmission lines for distribution to local networks, serving as a critical node for grid stability and power delivery.
Environmental considerations include electromagnetic field management, noise mitigation, vegetation management, and stormwater runoff control to minimize impact on surrounding areas.