Risk: Medium Substation Operational

Sand Lake Substation: Wisconsin Electrical Infrastructure

United States

Overview

Sand Lake is an operational electrical substation in Wisconsin, United States, handling voltages of 138 kV and 69 kV. It plays a key role in regional grid stability.

Sand Lake is an operational electrical substation located in Wisconsin, United States. As a substation, it serves as a critical node in the electrical grid, stepping down transmission-level voltages for distribution. The facility operates under the jurisdiction of the North American Electric Reliability Corporation (NERC) and is subject to Federal Energy Regulatory Commission (FERC) regulations for reliability and security. The substation handles two voltage levels: 138 kV and 69 kV, indicating its role in both high-voltage transmission and sub-transmission. This dual-voltage capability allows it to interconnect with different parts of the grid, enhancing flexibility and resilience. In the US context, substations of this scale are typically equipped with modern switchgear and protection systems compliant with NERC standards. Sand Lake's location in Wisconsin places it within a region with a mix of urban and rural loads, supporting both residential and industrial customers. The substation's operational status and voltage levels suggest it is integral to maintaining reliable power supply in the area, contributing to the overall stability of the regional electrical infrastructure.

Environmental context

The substation is situated in a temperate region of Wisconsin, characterized by seasonal weather variations that can impact grid operations. Its location in a mixed urban-rural area means it must balance reliability for densely populated zones with resilience against weather-related disruptions. The dual-voltage design helps mitigate risks by providing redundancy in power routing.

Frequently asked questions

Sand Lake substation is located in Wisconsin, United States, at coordinates 44.150165, -89.481644.

Sand Lake substation handles two voltage levels: 138 kV for transmission and 69 kV for sub-transmission.

Sand Lake substation is currently operational, as per available records.

US substations are regulated by NERC reliability standards and FERC regulations, ensuring grid stability and security.

A dual-voltage substation like Sand Lake allows interconnection between different voltage levels, improving grid flexibility and redundancy.