Sargent Road Substation is an operational electrical substation in Dallas, Texas, owned by Oncor. It operates at 345 kV and 138 kV, serving as a key node in the regional transmission grid.
Sargent Road Substation is an operational electrical substation located in Dallas, Texas, United States. Owned and operated by Oncor, a major transmission and distribution utility in Texas, this facility plays a critical role in the state's power grid. The substation handles high-voltage electricity at 345 kV and 138 kV, indicating its importance in both long-distance transmission and local distribution. As part of the Electric Reliability Council of Texas (ERCOT) grid, Sargent Road Substation operates under the regulatory framework of the Public Utility Commission of Texas (PUCT) and adheres to NERC reliability standards. The dual voltage levels suggest it serves as a step-down point, connecting bulk transmission lines to sub-transmission or distribution networks. Oncor's extensive infrastructure in the Dallas-Fort Worth area supports a growing urban and industrial load. The substation's location in an urban area underscores its significance for grid stability and reliability. It contributes to the resilience of the local electrical infrastructure, supporting residential, commercial, and industrial customers. The facility's operational status and integration into Oncor's network ensure continued service to the Dallas community.
Environmental context
Located in an urban setting in Dallas, Texas, the substation's environmental context is shaped by its role in supporting a dense population center. The facility's high voltage levels (345 kV and 138 kV) necessitate careful land use and electromagnetic field management. Urban substations often incorporate noise mitigation and visual screening to minimize impact on surrounding neighborhoods. The site's proximity to residential and commercial areas requires adherence to local zoning and environmental regulations.
Frequently asked questions
Sargent Road Substation is located in Dallas, Texas, United States, at coordinates 32.727861, -96.774173.
Sargent Road Substation is owned and operated by Oncor, a major electric transmission and distribution utility serving Texas.
Sargent Road Substation operates at 345 kV and 138 kV, indicating its role in both high-voltage transmission and sub-transmission.
As part of the ERCOT grid, Sargent Road Substation is regulated by the Public Utility Commission of Texas (PUCT) and must comply with NERC reliability standards.
Dual voltage levels like 345 kV and 138 kV allow a substation to step down power from long-distance transmission lines to lower voltages for local distribution, improving grid flexibility and reliability.