Overview
Sasser Substation is an operational electrical substation in Georgia, United States, operating at 46 kV. It plays a role in regional power distribution and grid stability.
Sasser Substation is an operational electrical substation located in Georgia, United States. The facility operates at a voltage of 46 kV, which places it in the medium-voltage range typical for distribution-level substations serving local communities and industrial areas. As a substation in the United States, Sasser Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for the bulk power system, ensuring that substations like Sasser maintain grid stability and comply with mandatory cybersecurity and maintenance protocols. The substation's location in southwestern Georgia supports the regional electrical grid, providing power to nearby residential, commercial, and agricultural customers. Its operational status indicates it is actively contributing to the local energy infrastructure, helping to meet demand and maintain service reliability in the area.
Environmental context
The substation is situated in a rural area of Georgia, where the surrounding landscape includes agricultural fields and scattered woodlands. Substations at this voltage level typically have a small physical footprint and minimal direct environmental impact, though they are critical for integrating renewable energy sources like solar farms that are increasingly common in the region. Proper maintenance of switchgear and transformers is essential to prevent oil leaks and ensure safe operation.
Frequently asked questions
Sasser Substation is located in Georgia, United States, near the coordinates 31.723145, -84.346361.
Sasser Substation operates at a voltage of 46 kV, which is typical for distribution-level substations.
Yes, Sasser Substation is listed as operational.
Substations in the United States must comply with NERC reliability standards and FERC regulations, which cover grid stability, cybersecurity, and maintenance.
A 46 kV substation typically steps down transmission voltage for local distribution, serving residential, commercial, and industrial customers in its area.