Overview
Seminole Ave is an operational electrical substation in the United States, operated by NatGrid with a voltage level of 34.5 kV, supporting local grid stability.
Seminole Ave is an operational electrical substation located in the United States, managed by NatGrid. The facility operates at a voltage level of 34.5 kV, classifying it as a medium-voltage substation typical for distribution networks in urban and suburban areas. As part of the U.S. electrical infrastructure, Seminole Ave operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These standards ensure grid reliability and compliance with mandatory reliability standards. The substation likely incorporates automation protocols such as IEC 61850 for efficient monitoring and control. This substation plays a critical role in distributing electricity to local communities, supporting residential, commercial, and industrial loads. Its operational status ensures continued service reliability, contributing to the overall resilience of the regional power grid.
Environmental context
The substation is located in a region with a temperate climate, where seasonal weather variations can impact grid operations. Its urban or suburban setting requires careful management of electromagnetic fields and noise to minimize community impact. The facility's design likely includes measures to prevent oil spills from transformers and to manage stormwater runoff, aligning with local environmental regulations.
Frequently asked questions
Seminole Ave substation is located in the United States, with coordinates 42.671178, -73.809751.
Seminole Ave substation operates at a voltage level of 34.5 kV, which is typical for distribution substations in the United States.
Seminole Ave substation is operated by NatGrid, a utility company responsible for its maintenance and grid integration.
Substations in the United States must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.
A 34.5 kV substation steps down transmission-level voltage for distribution to local networks, serving residential, commercial, and industrial customers.