Overview
Sheridan Substation is an operational electrical substation in Colorado, United States, operated by Public Service Company of Colorado. It operates at 115 kV, serving the local grid.
Sheridan Substation is an operational electrical substation located in Colorado, United States. It is owned and operated by Public Service Company of Colorado, a major utility in the region. The substation operates at a voltage of 115 kV, classifying it as a medium-voltage facility within the transmission and distribution network. As part of the United States electrical infrastructure, Sheridan Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for transmission-level assets. The substation likely plays a role in distributing power to residential, commercial, and industrial customers in the Denver metropolitan area. The substation's location in an urban setting underscores its importance for grid stability and local power distribution. Its operational status ensures continued service to the community, supporting the region's energy needs. The facility contributes to the resilience and reliability of Colorado's electrical grid.
Environmental context
The substation is situated in an urban area of Colorado, where electrical infrastructure is critical for supporting dense population and economic activities. The 115 kV voltage level indicates a role in distributing power from transmission lines to local distribution networks. Urban substations like this one are subject to stringent safety and environmental regulations to minimize electromagnetic interference and ensure public safety.
Frequently asked questions
Sheridan Substation is located in Colorado, United States, near coordinates 39.656140, -105.012839.
Sheridan Substation operates at a voltage of 115 kV, which is typical for medium-voltage substations in the United States.
Sheridan Substation is operated by Public Service Company of Colorado, a subsidiary of Xcel Energy.
As part of the US electrical grid, Sheridan Substation must comply with NERC reliability standards and FERC regulations for transmission-level assets.
A 115 kV substation typically steps down voltage from higher transmission lines for distribution to local networks, serving residential, commercial, and industrial customers.