Risk: Medium Substation Operational

Shirland Ave Substation - 69 kV Operational Facility in the United States

United States

Overview

Shirland Ave is an operational electrical substation in the United States, operating at 69 kV. It plays a role in regional power distribution and grid stability.

Shirland Ave is an operational electrical substation located in the United States. The facility operates at a voltage of 69 kV, which is typical for sub-transmission or distribution-level infrastructure, serving to step down power for local distribution networks. As a substation in the United States, Shirland Ave operates under the regulatory framework established by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards and ensure the stability of the bulk power system. The 69 kV voltage level indicates this substation likely connects transmission lines to distribution feeders, playing a critical role in maintaining grid reliability. The substation's operational status and location contribute to the electrical infrastructure serving the surrounding area. Substations like Shirland Ave are essential for voltage regulation, power flow control, and system protection, supporting residential, commercial, and industrial customers. Its role in the grid underscores the importance of maintaining aging switchgear and adhering to NERC standards for system reliability.

Environmental context

The substation is located in a region with a temperate climate, typical of the Midwestern United States. Electrical infrastructure in this area must withstand seasonal temperature variations and occasional severe weather events. The facility's urban or rural setting influences its environmental impact, with substations generally having a localized footprint. Proper maintenance of switchgear and transformers is essential to prevent oil leaks and minimize ecological disturbance.

Frequently asked questions

Shirland Ave substation is located in the United States, with coordinates approximately 42.494418, -89.070030.

Shirland Ave substation operates at a voltage of 69 kV, which is typical for sub-transmission or distribution-level substations.

Shirland Ave substation is currently operational, meaning it is actively used in the electrical grid.

Substations in the United States must comply with NERC reliability standards and FERC regulations, which ensure grid stability and system protection.

A 69 kV substation typically steps down transmission-level voltage for distribution to local networks, playing a key role in voltage regulation and power flow control.