Overview
Slate Substation is an operational 345 kV electrical substation in Michigan, United States, owned and operated by ITC. It plays a key role in the regional transmission grid.
Slate Substation is a high-voltage electrical substation located in Michigan, United States, with an operational status. The facility is owned and operated by ITC, a major transmission company in the region. Operating at 345 kV, it is classified as a large-scale substation critical for bulk power transmission. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for transmission-level assets. The 345 kV voltage level indicates its role in interconnecting major power lines and supporting grid stability across the Midwest. As part of ITC's transmission network, Slate Substation contributes to the reliable delivery of electricity to communities and industries in Michigan. Its location in a rural area underscores its importance in connecting remote generation sources to load centers, enhancing grid resilience and energy security.
Environmental context
The substation is situated in a rural area of Michigan, where agricultural land and natural habitats dominate the landscape. High-voltage infrastructure like Slate Substation can influence local ecosystems through electromagnetic fields and land use changes, though modern designs minimize ecological disruption. The facility's role in transmitting renewable energy from wind and solar farms in the region supports broader environmental goals by enabling clean energy integration.
Frequently asked questions
Slate Substation is located in Michigan, United States, at coordinates 43.209607, -84.529398.
Slate Substation operates at 345 kV, a high voltage level used for bulk power transmission in the US grid.
Slate Substation is owned and operated by ITC, a major independent transmission company in the United States.
As a transmission asset, Slate Substation must comply with NERC reliability standards and FERC regulations to ensure grid stability and security.
A 345 kV substation like Slate interconnects high-voltage transmission lines, enabling efficient long-distance power transfer and grid reliability.