Overview
Sour Springs Switch Station is an operational electrical substation in the United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.
Sour Springs Switch Station is an operational electrical substation located in the United States, with coordinates 43.153294, -78.364289. The facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation typical of regional distribution networks. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. As a 115 kV facility, it likely serves as a distribution substation stepping down transmission voltage for local use, or as a switching station for grid routing. This substation contributes to the electrical infrastructure of its region by supporting grid stability and power delivery to surrounding communities. Its operational status ensures continued service for local industrial, commercial, or residential loads, aligning with the broader reliability goals of the U.S. power grid.
Environmental context
The substation is located in a rural area near Sour Springs, New York, which is part of the Great Lakes region. The local environment includes agricultural land and natural habitats. Substations at this voltage level typically have a small physical footprint and minimal direct environmental impact, though they are critical for integrating renewable energy sources and maintaining grid reliability in the region.
Frequently asked questions
Sour Springs Switch Station is located in the United States at coordinates 43.153294, -78.364289, near Sour Springs in New York State.
Sour Springs Switch Station operates at 115 kV, which is a common voltage for distribution substations in the United States.
Sour Springs Switch Station is currently operational, meaning it is actively serving the electrical grid.
Substations in the United States must comply with NERC reliability standards and FERC regulations, which govern grid stability and operational safety.
A 115 kV substation typically steps down transmission voltage for distribution to local areas or serves as a switching point for routing power, ensuring reliable electricity delivery.