Substation Operational

Station 144 - 34.5 kV Substation Owned by Rochester Gas & Electric in the United States

United States

Overview

Station 144 is an operational substation owned by Rochester Gas & Electric in the United States, operating at 34.5 kV to support regional grid stability.

Station 144 is an electrical substation located in the United States, owned and operated by Rochester Gas & Electric. The facility is operational and serves as a key node in the local power distribution network, stepping down transmission-level voltages for end-user consumption. The substation operates at a voltage of 34.5 kV, which is typical for sub-transmission or primary distribution in the U.S. grid. As part of the Rochester Gas & Electric system, it falls under the regulatory oversight of the New York State Public Service Commission and must comply with NERC reliability standards for grid stability and safety. Located in upstate New York, Station 144 supports the electrical infrastructure for the surrounding community, contributing to reliable power delivery. Its role in the distribution network helps manage load demands and maintain voltage stability, which is critical for both residential and commercial customers in the region.

Environmental context

The substation's location in a temperate climate with seasonal extremes requires robust design to handle temperature variations and potential ice or snow loads. Its urban or suburban setting near Rochester means it must integrate with existing land use while minimizing electromagnetic field exposure. The 34.5 kV voltage level indicates a medium-scale facility that balances local distribution needs with environmental footprint.

Frequently asked questions

Station 144 is located in the United States, near Rochester, New York, at coordinates 42.872656, -77.290171.

Station 144 operates at a voltage of 34.5 kV, which is typical for sub-transmission or primary distribution substations.

Station 144 is owned and operated by Rochester Gas & Electric, a utility serving the Rochester, New York area.

In the United States, substations must comply with NERC reliability standards and FERC regulations for grid stability, as well as state-level oversight by public utility commissions.

A 34.5 kV substation typically steps down higher transmission voltages for local distribution, serving as a critical link between the bulk power system and end users.
UtilityRadar
More
Press Esc to close · Browse by sector