Substation Operational

Station 167 Electrical Substation | Rochester Gas & Electric, New York

United States

Overview

Station 167 is an operational electrical substation in New York, United States, owned and operated by Rochester Gas & Electric. It operates at 34.5 kV, serving the local grid.

Station 167 is an electrical substation located in New York, United States, owned and operated by Rochester Gas & Electric. The facility is operational and plays a role in the regional power distribution network. The substation operates at a voltage of 34.5 kV, which is typical for distribution-level infrastructure in the United States. As part of the Rochester Gas & Electric system, it is subject to North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) regulations for grid stability and safety. The substation supports the local electrical grid in New York, contributing to reliable power delivery for residential, commercial, and industrial customers. Its location in a rural area near Rochester underscores its role in serving both urban and rural communities.

Environmental context

The substation is located in a rural area of New York, where the surrounding landscape includes agricultural fields and woodlands. Electrical infrastructure in such settings typically has minimal direct environmental impact, though it supports the broader grid that enables renewable energy integration and electrification. The 34.5 kV voltage level indicates a distribution substation, which generally has a smaller footprint than high-voltage transmission facilities.

Frequently asked questions

Station 167 is located in New York, United States, near the city of Rochester. The exact coordinates are 42.794871 N, -77.829437 W.

Station 167 operates at 34.5 kV, which is a standard distribution voltage level in the United States.

Station 167 is owned and operated by Rochester Gas & Electric, a utility serving the Rochester, New York area.

In the United States, substations are subject to NERC reliability standards and FERC regulations for grid stability and safety. Local state regulations also apply.

A 34.5 kV substation typically steps down transmission voltage for distribution to local customers, playing a key role in delivering electricity to homes and businesses.
UtilityRadar
More
Press Esc to close · Browse by sector