Overview
Storm Lake Wind Farm is a substation in Iowa, United States, operated by Allete Clean Energy. It operates at 161 kV, supporting wind energy transmission.
Storm Lake Wind Farm is a substation located in Iowa, United States, operated by Allete Clean Energy. The facility operates at a voltage of 161 kV, which is typical for transmission-level substations connecting wind farms to the grid. As part of the wind energy infrastructure, it plays a key role in collecting and transmitting power from wind turbines. The substation operates under the regulatory framework of the United States, including NERC reliability standards and FERC oversight for transmission assets. The 161 kV voltage level indicates it is a medium-to-high voltage substation, essential for integrating renewable energy into the regional grid. The facility is likely equipped with modern switchgear and automation systems compliant with ISO/IEC 61850 standards. Located in rural Iowa, the substation supports the local wind energy industry, contributing to the state's significant wind power capacity. Its operation helps reduce carbon emissions by enabling clean energy delivery to consumers. The facility's grid connection enhances regional energy resilience and supports renewable energy goals.
Environmental context
The substation is situated in a rural agricultural area of Iowa, where wind energy development has expanded rapidly. The local environment includes farmland and open plains, with minimal urban impact. The facility's operation supports clean energy generation, reducing reliance on fossil fuels and contributing to lower greenhouse gas emissions. The surrounding landscape is typical for wind farms, with turbines spread across agricultural fields.
Frequently asked questions
Storm Lake Wind Farm is located in Iowa, United States, near the city of Storm Lake. The substation coordinates are approximately 42.6867 N, -95.2605 W.
The substation operates at a voltage of 161 kV, which is a common transmission voltage for connecting wind farms to the electrical grid.
The substation is operated by Allete Clean Energy, a company specializing in renewable energy projects.
As a US transmission asset, the substation must comply with NERC reliability standards and FERC regulations. It likely follows ISO/IEC 61850 for substation automation.
The substation collects power from wind turbines and steps up voltage for transmission, helping integrate renewable energy into the regional grid and improving grid stability.