Overview
Subestación Camino Nuevo is an operational substation in Puerto Rico, owned and operated by the Puerto Rico Electric Power Authority. It operates at 115 kV, serving the island's electrical grid.
Subestación Camino Nuevo is a substation located in Puerto Rico, United States, owned and operated by the Puerto Rico Electric Power Authority (PREPA). The facility is operational and plays a role in the island's electrical infrastructure, with a voltage level of 115 kV, which is typical for subtransmission and distribution substations. As part of PREPA's network, this substation operates under the regulatory framework of the United States, including NERC reliability standards and FERC oversight for transmission-level assets. In Puerto Rico, the grid faces unique challenges due to its island geography and vulnerability to hurricanes, which influence operational and maintenance practices. The substation contributes to grid stability and power distribution in the region. Its location and voltage level indicate it serves local communities and possibly industrial or commercial areas. The facility's role is significant for maintaining reliable electricity supply in the area.
Environmental context
The substation is located in a tropical island environment prone to hurricanes and seismic activity, which can impact infrastructure resilience. The surrounding area may include urban or rural settings, and the facility's design likely incorporates measures to withstand extreme weather. The 115 kV voltage level suggests it is part of the subtransmission network, connecting generation to distribution systems.
Frequently asked questions
Subestación Camino Nuevo is located in Puerto Rico, United States, at coordinates 18.042847, -65.850849.
The substation operates at 115 kV, which is a common voltage for subtransmission and distribution substations.
The substation is owned and operated by the Puerto Rico Electric Power Authority (PREPA), the primary electric utility in Puerto Rico.
As part of the US electrical grid, the substation must comply with NERC reliability standards and FERC regulations for transmission-level assets.
A 115 kV substation typically steps down voltage from higher transmission levels for distribution to local networks, serving as a critical node for power delivery.