Substation Operational

Subestación Las Vegas - 38 kV Substation in Puerto Rico, United States

United States

Overview

Subestación Las Vegas is an operational substation in Puerto Rico, owned by the Puerto Rico Electric Power Authority. It operates at 38 kV, serving the local electrical grid.

Subestación Las Vegas is a substation located in Puerto Rico, United States, and is owned and operated by the Puerto Rico Electric Power Authority (PREPA). The facility is operational and plays a role in the island's electrical infrastructure, with a voltage level of 38 kV, classifying it as a medium-voltage substation. As part of the U.S. territory, the substation operates under the regulatory framework of the Federal Energy Regulatory Commission (FERC) and adheres to North American Electric Reliability Corporation (NERC) reliability standards. PREPA manages the generation, transmission, and distribution of electricity across Puerto Rico, and this substation contributes to the stability of the local grid. The substation's location in the western region of Puerto Rico supports the electrical needs of surrounding communities. Its role in the distribution network is critical for maintaining reliable power supply, especially given the island's vulnerability to natural disasters such as hurricanes, which can impact grid infrastructure.

Environmental context

The substation is situated in a tropical climate zone prone to hurricanes and seismic activity, which poses risks to electrical infrastructure. Its location in a rural area of western Puerto Rico means it serves a mix of residential and agricultural loads. The surrounding environment includes hills and vegetation, requiring vegetation management to prevent outages.

Frequently asked questions

Subestación Las Vegas is located in Puerto Rico, United States, at coordinates 18.182411, -67.029028.

Subestación Las Vegas operates at a voltage of 38 kV, which is typical for medium-voltage substations in distribution networks.

The substation is owned by the Puerto Rico Electric Power Authority (PREPA), the primary electric utility in Puerto Rico.

As part of the U.S. electrical grid, the substation must comply with NERC reliability standards and FERC regulations for transmission and distribution assets.

A 38 kV substation typically steps down voltage from higher transmission levels for distribution to local consumers, ensuring stable power delivery.
UtilityRadar
More
Press Esc to close · Browse by sector