Substation Operational

Subestación Mogote - 115 kV Electrical Substation in Puerto Rico

United States

Overview

Subestación Mogote is an operational electrical substation in Puerto Rico, operated by the Puerto Rico Electric Power Authority. It operates at a voltage level of 115 kV, serving as a key node in the island's transmission grid.

Subestación Mogote is an operational electrical substation located in Puerto Rico, a territory of the United States. The facility is owned and operated by the Puerto Rico Electric Power Authority (PREPA), the primary electric utility on the island. With a voltage level of 115 kV, it is classified as a high-voltage substation, playing a critical role in the transmission and distribution of electricity across the region. As a substation operating at 115 kV, Subestación Mogote is part of the bulk power transmission system in Puerto Rico. The facility adheres to regulatory standards set by the U.S. Federal Energy Regulatory Commission (FERC) and the North American Electric Reliability Corporation (NERC), which enforce reliability and security requirements for the grid. Substations of this voltage level typically serve as distribution hubs, stepping down power from higher transmission voltages for local distribution networks. The substation's location in Puerto Rico places it within a grid that has faced significant challenges, including vulnerability to hurricanes and other natural disasters. Subestación Mogote contributes to the resilience and stability of the local power supply, supporting communities and critical infrastructure. Its operational status ensures continued electricity delivery to residential, commercial, and industrial customers in the area.

Environmental context

Subestación Mogote is situated in Puerto Rico, a tropical island with a climate that includes hurricane risks and high humidity. The substation's equipment must be designed to withstand extreme weather events, including strong winds and flooding. The surrounding environment is characterized by urban or semi-urban development, with the substation's footprint potentially affecting local land use. Proper maintenance and vegetation management are essential to prevent outages and ensure safety.

Frequently asked questions

Subestación Mogote is located in Puerto Rico, a territory of the United States. Its approximate coordinates are 18.12° N, 66.17° W.

Subestación Mogote operates at a voltage of 115 kV, which is a standard high-voltage level for transmission and distribution substations.

The substation is owned and operated by the Puerto Rico Electric Power Authority (PREPA), the main electric utility in Puerto Rico.

Substations in Puerto Rico, as part of the U.S. electrical grid, must comply with NERC reliability standards and FERC regulations. These ensure grid stability and security.

A 115 kV substation typically steps down high-voltage electricity from transmission lines to lower voltages for distribution to homes and businesses, or interconnects different parts of the grid.