Risk: Medium Substation Operational

Substation 41 - 115 kV Electrical Substation in the United States

United States

Overview

Substation 41 is an operational electrical substation in the United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.

Substation 41 is an operational electrical substation located in the United States, with coordinates near Albuquerque, New Mexico. The facility operates at a voltage level of 115 kV, classifying it as a medium-voltage substation typical of distribution-level infrastructure that supports local grid reliability. As a substation in the United States, Substation 41 operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) oversight for transmission-level assets. The 115 kV voltage level is common for sub-transmission and distribution networks, connecting bulk power systems to local utilities and end-users. The substation's location in an urban or suburban area of New Mexico places it within a region experiencing growing energy demand. Its operational status ensures continued support for grid stability and electricity delivery to residential, commercial, and industrial customers in the surrounding area.

Environmental context

The substation is situated in a semi-arid climate typical of the Southwestern United States, where high temperatures and low precipitation can affect equipment performance and cooling requirements. Its urban or suburban setting means it is integrated into a landscape with existing infrastructure, minimizing additional land disturbance. The 115 kV voltage level indicates a role in local distribution, with potential environmental considerations related to electromagnetic fields and land use.

Frequently asked questions

Substation 41 is located in the United States, with coordinates 35.051354, -106.534281, near Albuquerque, New Mexico.

Substation 41 operates at a voltage of 115 kV, which is typical for sub-transmission and distribution networks.

Substation 41 is currently operational, indicating it is active and contributing to the electrical grid.

As a US substation, it must comply with NERC reliability standards and FERC regulations for grid stability and safety.

A 115 kV substation typically steps down voltage from transmission lines to distribution levels, serving local communities and industries.