Risk: Medium Substation Operational

Sunoco Substation - High-Voltage Electrical Substation in the United States

United States

Overview

Sunoco Substation is an operational electrical substation in the United States, operating at 230 kV. It plays a role in regional grid stability and power distribution.

Sunoco Substation is an operational electrical substation located in the United States, with coordinates 40.222270, -76.716675. The facility operates at a voltage of 230 kV, classifying it as a high-voltage substation critical for transmission-level power distribution. As part of the U.S. electrical grid, it supports the reliable delivery of electricity to industrial and residential consumers. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. The 230 kV voltage level indicates its role in regional transmission networks, often connecting generation sources to distribution systems. Substations of this scale typically employ modern switchgear and automation systems compliant with ISO/IEC 61850 standards. Sunoco Substation contributes to the stability of the local power grid, serving as a key node in the electrical infrastructure of the region. Its operational status ensures continued support for energy demands, while its location in the United States aligns with stringent regulatory oversight to maintain grid reliability and safety.

Environmental context

The substation is situated in a region with a mix of urban and rural areas, typical of the Mid-Atlantic United States. Its 230 kV voltage level suggests it handles significant power flows, which can influence local electromagnetic fields and land use. The facility's design likely includes measures to mitigate environmental impact, such as oil containment for transformers and noise reduction. The surrounding landscape supports both industrial and natural habitats, requiring careful siting to minimize ecological disruption.

Frequently asked questions

Sunoco Substation is located in the United States at coordinates 40.222270, -76.716675, likely in the Mid-Atlantic region.

Sunoco Substation operates at 230 kV, a high-voltage level used for transmission in the U.S. electrical grid.

A 230 kV substation steps down transmission voltage for distribution or interconnects transmission lines, ensuring reliable power delivery to industrial and residential areas.

As a U.S. substation, it must comply with NERC reliability standards and FERC regulations for grid stability and safety.

By operating at 230 kV, it helps balance load and transmit power efficiently, supporting regional grid stability under NERC oversight.