Sunrise Substation is an operational electrical substation in the United States, operating at 138 kV. It plays a key role in regional grid stability and power distribution.
Sunrise Substation is an operational electrical substation located in the United States, with coordinates 40.537397, -112.018082. Operating at a voltage of 138 kV, it is classified as a high-voltage substation, typical for transmission-level infrastructure that supports bulk power transfer and grid reliability. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for transmission assets. As a 138 kV facility, it likely serves as a key node in the regional transmission network, stepping down power from higher voltages or interconnecting local distribution systems. Sunrise Substation contributes to the electrical infrastructure of the surrounding area, ensuring stable power supply for residential, commercial, and industrial users. Its operational status indicates ongoing maintenance and compliance with grid codes, supporting the overall resilience of the U.S. power grid.
Environmental context
The substation is located in a region with a semi-arid climate, typical of the western United States. Its operation involves electromagnetic fields and potential impacts on local wildlife, though modern substations are designed with mitigation measures. The facility's voltage level and location influence its environmental footprint, with transmission lines requiring corridors that may affect land use.
Frequently asked questions
Sunrise Substation is located in the United States at coordinates 40.537397, -112.018082, operating as a high-voltage substation.
Sunrise Substation operates at 138 kV, a common voltage level for transmission substations in the United States.
Sunrise Substation is currently operational, indicating it is active and contributing to the electrical grid.
As a U.S. substation, Sunrise Substation must comply with NERC reliability standards and FERC regulations for transmission-level assets.
A 138 kV substation typically serves as a transmission-level node, stepping down power from higher voltages or interconnecting distribution networks to ensure reliable electricity supply.