Risk: Medium Substation Operational

Surowiec Substation: High-Voltage Electrical Substation in Maine, United States

United States

Overview

Surowiec Substation is an operational electrical substation in Maine, United States, owned and operated by Central Maine Power Company. It handles voltages of 345 kV and 115 kV, serving the regional grid.

Surowiec Substation is an operational electrical substation located in Maine, United States. Owned and operated by Central Maine Power Company, this facility plays a key role in the regional transmission network, handling high-voltage electricity at 345 kV and 115 kV. The substation is part of the broader New England power grid, which is regulated by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). As a substation operating at 345 kV, Surowiec Substation is classified as a high-voltage transmission asset, critical for long-distance power transfer and grid stability. The 115 kV level indicates distribution-level service to local communities. The facility is located in a rural area of Maine, where the grid supports a mix of residential, commercial, and industrial loads, including the state's growing renewable energy sector. The substation's operational status and voltage levels suggest it is a key node in Central Maine Power's network, facilitating the integration of generation sources and ensuring reliable electricity supply. Its location in Maine, a state with significant hydroelectric and wind resources, underscores its role in balancing variable renewable generation with demand. The facility adheres to NERC reliability standards and FERC regulations, ensuring safe and stable operation.

Environmental context

The substation is situated in a rural area of Maine, where the surrounding landscape includes forests and agricultural land. The high-voltage equipment, such as transformers and switchgear, is designed to minimize environmental impact through proper insulation and containment. The facility's operation supports the integration of renewable energy sources like wind and hydro, contributing to reduced greenhouse gas emissions. However, the presence of high-voltage lines may pose risks to local wildlife, particularly birds, though mitigation measures are typically in place.

Frequently asked questions

Surowiec Substation is located in Maine, United States, at coordinates 43.931889, -70.203315. It is owned and operated by Central Maine Power Company.

Surowiec Substation operates at two voltage levels: 345 kV for high-voltage transmission and 115 kV for sub-transmission or distribution, making it a key node in the regional grid.

Surowiec Substation is owned and operated by Central Maine Power Company, a major utility serving the state of Maine.

As part of the US electrical grid, Surowiec Substation must comply with NERC reliability standards and FERC regulations for transmission assets, ensuring grid stability and safety.

Surowiec Substation facilitates the transmission of electricity from generation sources to distribution networks, supporting the integration of renewable energy and maintaining reliable power supply in Maine.