Risk: Medium Substation Operational

SW 64th Substation - Operational 69 kV Electrical Substation in the United States

United States

Overview

SW 64th Substation is an operational electrical substation in the United States, operating at 69 kV. It plays a role in regional grid stability and power distribution.

SW 64th Substation is an operational electrical substation located in the United States, with coordinates 35.402804, -97.574763. The facility operates at a voltage of 69 kV, classifying it as a medium-voltage substation typical of distribution-level infrastructure in the region. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for grid stability. As a 69 kV facility, it likely serves as a distribution substation stepping down power from higher transmission voltages for local delivery. The environmental context of the substation includes its location in an area with potential urban or suburban development, given its proximity to Oklahoma City. The facility's role in the electrical grid supports community energy needs, and its operational status ensures continued reliability for the local power network.

Environmental context

The substation is situated in a region with a mix of urban and rural landscapes, typical of the Southern Plains. Its 69 kV voltage level indicates a distribution role, which may involve proximity to residential or commercial areas. The facility's operation contributes to grid stability, but aging switchgear or urban encroachment could pose environmental considerations.

Frequently asked questions

SW 64th Substation is located in the United States at coordinates 35.402804, -97.574763, near Oklahoma City.

SW 64th Substation operates at a voltage of 69 kV, which is typical for distribution-level substations.

SW 64th Substation is currently operational, meaning it is active and contributing to the electrical grid.

As a US substation, SW 64th Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.

A 69 kV substation typically steps down higher transmission voltages for local distribution, serving residential, commercial, and industrial customers.