Teggerdine Substation is an operational electrical substation in the United States, operating at 40 kV. It plays a role in regional grid stability and power distribution.

Teggerdine Substation is an operational electrical substation located in the United States, with coordinates 42.651302, -83.493784. The facility operates at a voltage of 40 kV, placing it in the medium-voltage range typical for distribution substations that serve local industrial, commercial, and residential loads. As a substation in the United States, Teggerdine Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) oversight for transmission-level assets. Substations of this voltage class are critical for stepping down power from higher transmission voltages to distribution levels, ensuring grid stability and reliability in the surrounding area. The substation's location in the Midwest region of the United States places it within a grid that supports a mix of urban and rural loads. Its operational status indicates it is actively contributing to the electrical infrastructure, facilitating the safe and efficient delivery of electricity to end users. The facility's role in the local grid underscores its importance in maintaining continuous power supply and supporting economic activity.

Environmental context

The substation is located in a region with a temperate climate, where seasonal temperature variations can affect electricity demand for heating and cooling. The surrounding area includes both residential and commercial developments, and the substation's operation is designed to minimize environmental impact through standard electromagnetic field management and noise control measures. Its urban-suburban setting requires careful integration with local land use and community planning.

Frequently asked questions

Teggerdine Substation is located in the United States at coordinates 42.651302, -83.493784, which places it in the Midwest region.

Teggerdine Substation operates at a voltage of 40 kV, which is typical for distribution-level substations.

Teggerdine Substation is currently operational, meaning it is actively functioning as part of the electrical grid.

Substations in the United States must comply with NERC reliability standards and FERC regulations, which ensure grid stability and safety.

A 40 kV substation typically steps down higher transmission voltages to distribution levels, serving local communities and industries with reliable power.