Overview
Tiger Bay Substation is an operational electrical substation in the United States, handling 230 kV voltage. It plays a key role in regional grid stability and power distribution.
Tiger Bay Substation is an operational electrical substation located in the United States, with coordinates 27.747214, -81.849699. The facility operates at a voltage of 230 kV, classifying it as a high-voltage transmission substation critical for bulk power transfer and grid reliability. Operating within the United States, this substation adheres to NERC reliability standards and FERC regulations for transmission-level assets. The 230 kV voltage level indicates it serves as a key node in the regional transmission network, likely interconnecting generation sources with load centers. Substations of this scale typically employ modern switchgear and protection systems compliant with ISO/IEC 61850 standards. As part of the electrical infrastructure, Tiger Bay Substation supports the stability of the local power grid, facilitating the efficient transmission of electricity to residential, commercial, and industrial consumers. Its operational status ensures continued service to the surrounding community, contributing to energy security and economic activity in the region.
Environmental context
The substation's location in a region with a warm climate may influence cooling and insulation requirements for equipment. Its voltage level and role in the transmission grid mean it has a moderate environmental footprint, primarily through land use and potential electromagnetic fields. Proximity to urban or natural areas would dictate specific mitigation measures, though no specific designations are confirmed.
Frequently asked questions
Tiger Bay Substation is located in the United States at coordinates 27.747214, -81.849699.
Tiger Bay Substation operates at 230 kV, a high-voltage level used for bulk power transmission.
Tiger Bay Substation is currently operational.
Substations in the United States must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.
A 230 kV substation serves as a critical node in the transmission network, stepping down voltage for distribution or interconnecting generation sources to load centers.