Risk: Medium Substation Operational

Tinker #3 Substation - Operational 69 kV Substation in the United States

United States

Overview

Tinker #3 Substation is an operational electrical substation in the United States, serving the Tinker Air Force Base area with a voltage level of 69 kV.

Tinker #3 Substation is an operational electrical substation located in the United States, near Tinker Air Force Base in Oklahoma. The facility operates at a voltage of 69 kV, placing it in the medium-voltage range typical for distribution substations supporting industrial and military installations. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for the bulk power system. As a substation serving a critical defense facility, it likely adheres to stringent reliability and security protocols. Tinker #3 Substation plays a key role in ensuring stable power supply to Tinker Air Force Base, a major military installation. Its operational status and voltage level indicate it is a medium-scale substation contributing to local grid resilience and national defense infrastructure.

Environmental context

The substation is located in a semi-urban area near Oklahoma City, with a climate characterized by hot summers and occasional severe thunderstorms. The surrounding region includes mixed industrial and residential zones, with the substation's footprint likely minimal. Its voltage level and role in supporting a military base suggest moderate environmental considerations, such as electromagnetic field management and storm resilience.

Frequently asked questions

Tinker #3 Substation is located near Tinker Air Force Base in Oklahoma, United States, at coordinates 35.424835, -97.422816.

Tinker #3 Substation operates at a voltage of 69 kV, which is typical for distribution-level substations.

The operator of Tinker #3 Substation is not publicly listed, but it is likely managed by a local utility or the U.S. military as part of the Tinker Air Force Base infrastructure.

Substations in the United States must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.

A 69 kV substation typically steps down transmission voltage for distribution to industrial or residential customers, playing a critical role in local grid reliability.