Overview
Tinker #6 Substation is an operational electrical substation in the United States, operating at 138 kV. It plays a role in regional grid stability and power distribution.
Tinker #6 Substation is an operational electrical substation located in the United States, with coordinates 35.414423, -97.372881. The facility operates at a voltage of 138 kV, placing it in the medium-to-high voltage range typical for sub-transmission and distribution substations. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. As a 138 kV facility, it likely serves as a critical node connecting transmission and distribution networks, supporting local grid stability. This substation contributes to the electrical infrastructure of the region, ensuring reliable power delivery to surrounding communities and industrial users. Its operational status indicates ongoing service, and its location near Tinker Air Force Base suggests potential strategic importance for both civilian and military power needs.
Environmental context
The substation is located in an urbanized area near Oklahoma City, with a mix of residential, commercial, and industrial land uses. The 138 kV voltage level indicates moderate environmental footprint, with typical considerations including electromagnetic fields (EMF) and visual impact. Substations of this scale are generally designed with mitigation measures such as landscaping and noise control to minimize local disturbance.
Frequently asked questions
Tinker #6 Substation is located in the United States, near coordinates 35.414423, -97.372881, in the vicinity of Tinker Air Force Base in Oklahoma.
Tinker #6 Substation operates at a voltage of 138 kV, which is typical for sub-transmission and distribution substations in the United States.
Tinker #6 Substation is currently operational, indicating it is actively serving the electrical grid.
As a US substation, Tinker #6 Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.
A 138 kV substation typically steps down transmission voltage for distribution or interconnects transmission lines, playing a key role in regional power delivery and grid reliability.