Overview
Transco 115 Substation is an operational electrical substation in Georgia, United States, owned and operated by Georgia Power. It operates at 230 kV, serving as a key node in the regional transmission grid.
Transco 115 Substation is an operational electrical substation located in Georgia, United States. Owned and operated by Georgia Power, a major utility in the region, this facility plays a critical role in the state's electrical infrastructure. Operating at 230 kV, it is classified as a high-voltage substation, typical of transmission-level assets that interconnect bulk power systems. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the U.S. power grid. As part of Georgia Power's network, it adheres to stringent operational protocols to ensure grid stability and security. The 230 kV voltage level indicates its role in transmitting electricity over long distances, connecting generation sources to distribution networks. Located in a region with a mix of urban and rural areas, Transco 115 Substation supports the electrical needs of communities and industries in Georgia. Its operational status and integration into the broader grid highlight its importance in maintaining reliable power supply. The substation's design and technology align with modern standards for efficiency and safety, contributing to the resilience of the local electrical infrastructure.
Environmental context
The substation is situated in Georgia, a state with a diverse climate ranging from humid subtropical conditions in the south to more temperate zones in the north. The region experiences seasonal weather patterns, including thunderstorms and occasional hurricanes, which can impact grid reliability. The facility's design incorporates measures to withstand such environmental stresses, ensuring continuous operation. Its location in a mixed urban-rural area means it supports both residential and industrial loads, with considerations for minimizing electromagnetic field exposure and land use impacts.
Frequently asked questions
Transco 115 Substation is located in Georgia, United States, at coordinates 33.370270, -84.909729. It is owned and operated by Georgia Power.
Transco 115 Substation operates at 230 kV (230,000 volts), classifying it as a high-voltage transmission substation.
The substation is owned and operated by Georgia Power, a subsidiary of Southern Company and a major electric utility in the southeastern United States.
As part of the U.S. bulk power system, Transco 115 Substation must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.
A 230 kV substation serves as a key node in the transmission grid, stepping down voltage from higher levels for distribution or interconnecting different parts of the power system to ensure reliable electricity delivery.