Substation Operational

UF Substation #5 - Operational Distribution Substation in the United States

United States

Overview

UF Substation #5 is an operational electrical substation located in the United States near coordinates 29.644661, -82.355603. It operates at a voltage of 13.8 kV, serving local grid stability.

UF Substation #5 is an operational electrical substation located in the United States, with coordinates 29.644661, -82.355603. The facility operates at a voltage of 13.8 kV, indicating a distribution-level substation that steps down power for local consumption. As part of the U.S. electrical infrastructure, it falls under the regulatory oversight of NERC reliability standards and FERC for transmission-level assets, though distribution substations are typically regulated at the state level. The substation's voltage of 13.8 kV is common for medium-voltage distribution networks, serving industrial, commercial, or residential areas. The facility's location in the southeastern U.S. The substation likely includes switchgear, transformers, and protection systems compliant with IEEE and ISO/IEC 61850 standards for automation. UF Substation #5 plays a critical role in maintaining grid reliability for its service area. Its operational status ensures continuous power delivery, supporting local economic activities and community needs. The facility's age and specific equipment are not detailed, but its voltage level suggests it is a key node in the distribution network, contributing to voltage regulation and load balancing.

Environmental context

The substation is located in a region with a humid subtropical climate, which can affect equipment performance and maintenance schedules. The area's flat terrain and proximity to water bodies may influence grounding and flood risk. As a distribution substation, its environmental impact is minimal, primarily related to electromagnetic fields and visual intrusion. The facility's design likely includes measures to mitigate these effects, such as proper insulation and screening.

Frequently asked questions

UF Substation #5 is located in the United States at coordinates 29.644661, -82.355603, likely in the state of Florida given the latitude and longitude.

UF Substation #5 operates at a voltage of 13.8 kV, which is typical for distribution-level substations in the United States.

UF Substation #5 is currently operational, meaning it is actively serving the electrical grid.

In the United States, substations are subject to NERC reliability standards for grid stability and FERC regulations for transmission assets. Distribution substations also comply with state-level utility commission rules and IEEE standards.

A distribution substation steps down voltage from transmission levels to lower voltages suitable for local distribution, ensuring reliable power delivery to homes and businesses.