Overview

United States, operated by Clay Electric Cooperative. It operates at 115 kV, serving the local grid.

It is operated by Clay Electric Cooperative, a member-owned utility serving residential and commercial customers in north-central Florida. The facility is operational and plays a role in the regional electrical infrastructure. The substation operates at a voltage of 115 kV, which is a common transmission-level voltage in the United States, typically used for sub-transmission or distribution. As part of the US grid, it is subject to NERC reliability standards and FERC regulation for transmission-level assets. The facility likely includes switchgear and transformers to step down voltage for local distribution. This substation supports the reliability of the local power grid in a region that experiences hurricane risks and growing demand. Clay Electric Cooperative serves over 70,000 members, and this facility contributes to maintaining stable electricity supply for the community. Its location in Florida underscores the importance of resilient infrastructure against weather-related disruptions.

Environmental context

The substation is located in a rural-suburban area of Florida, where the local environment includes wetlands and pine forests. Electrical infrastructure in this region must be designed to withstand hurricane-force winds and flooding. The 115 kV voltage level indicates a role in distributing power from transmission lines to local feeders, with environmental considerations including vegetation management and stormwater runoff control.

Frequently asked questions

The substation is located near Clay County, Florida, United States, at coordinates 30.160124, -81.768315.

The substation is operated by Clay Electric Cooperative, a member-owned electric utility serving north-central Florida.

The substation operates at 115 kV, which is a common sub-transmission voltage in the United States.

As part of the US electrical grid, the substation is subject to NERC reliability standards and FERC regulation for transmission-level assets.

A 115 kV substation typically steps down transmission voltage for local distribution, serving residential and commercial customers within a regional utility network.