Risk: Medium Substation Operational

VFW Park Substation - 230 kV Electrical Substation in the United States

United States

Overview

VFW Park Substation is an operational electrical substation in the United States, operating at 230 kV. It plays a key role in regional grid stability and power distribution.

VFW Park Substation is an operational electrical substation located in the United States, with coordinates near 29.96°N, 93.90°W. The facility operates at a voltage level of 230 kV, classifying it as a high-voltage substation critical for transmission and distribution of electricity across the grid. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. As a 230 kV facility, it is typical of medium-to-large scale substations that interconnect transmission lines and serve load centers or industrial areas. VFW Park Substation contributes to the reliability and resilience of the local electrical infrastructure. Its operational status ensures continued power supply to surrounding communities and supports grid stability. The facility's location and voltage level underscore its importance in the regional power network.

Environmental context

The substation is located in a region with a humid subtropical climate, which can influence equipment maintenance and vegetation management. Its urban or suburban setting requires careful land use planning to minimize visual and noise impacts. The 230 kV voltage level indicates potential electromagnetic field considerations, though standard mitigation practices are typically employed.

Frequently asked questions

VFW Park Substation is located in the United States, with approximate coordinates 29.96°N, 93.90°W.

VFW Park Substation operates at a voltage of 230 kV, which is a high-voltage level used for transmission and sub-transmission in the electrical grid.

Substations in the US are typically operated by utility companies or grid operators subject to NERC and FERC regulations.

As a US substation, VFW Park Substation must comply with NERC reliability standards and FERC regulations for bulk power system operation, including requirements for maintenance, protection, and cybersecurity.

A 230 kV substation serves as a node in the transmission network, stepping down voltage for distribution or interconnecting transmission lines. It is critical for grid stability and power delivery to load centers.