Overview

Vicksburg Substation is an operational electrical substation in Vicksburg, Mississippi, United States, operating at 115 kV and serving the local grid.

Vicksburg Substation is an operational electrical substation located in Vicksburg, Mississippi, United States. It operates at a voltage of 115 kV, classifying it as a medium-voltage substation that plays a key role in distributing electricity within the regional power grid. The substation operates under the regulatory framework of the United States, which includes NERC reliability standards and FERC oversight for transmission-level assets. As a 115 kV facility, it likely serves as a distribution substation, stepping down power from higher voltage transmission lines to supply local industrial, commercial, and residential customers. Vicksburg Substation supports the electrical infrastructure of the Vicksburg area, contributing to grid stability and reliability. Its location in a region with a mix of urban and rural areas underscores its importance in maintaining consistent power supply for community services and economic activities.

Environmental context

The substation is situated in Vicksburg, Mississippi, a city along the Mississippi River with a humid subtropical climate. The area experiences seasonal thunderstorms and occasional hurricanes, which can pose risks to electrical infrastructure. The substation's design likely includes measures to withstand such weather events, ensuring continued grid stability for the surrounding community.

Frequently asked questions

Vicksburg Substation is located in Vicksburg, Mississippi, United States, at coordinates 32.315569, -90.892552.

Vicksburg Substation operates at a voltage of 115 kV, which is typical for distribution substations in the United States.

Vicksburg Substation is currently operational, serving the local electrical grid in the Vicksburg area.

In the United States, substations like Vicksburg Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.

A 115 kV substation typically steps down transmission-level voltage to distribution levels, supplying electricity to local communities and industries.